Projects
Representative past projects handled by AA Electric
Bank of Hawaii, Data Center at Kapolei
1 million feet of CAT5 cables, 2000 workstations, 18 telecommunication rooms, 36 data cabinets, 432 fiber optic terminations
(US Army) Schofield Barrakcs
Part of Whole Barrack renewal. Data, Voice, CATV, Optical Fibers installaions in all staff quarters, cafeteria, training, and operation facilities.
Interstate Building, 1314 King St.
Fire damage repair for 14/F, 15/F and 16/F. Ground Fault Relay Installation.
Diamond Head Vista
Infrared Thermography for hot spot detection. Subsequent troubleshooting and maintence in power arcing prevention.
Costco, Salt Lake
Repair / re-run conduits in ceiling, improvements in electrical systems.
Colony at the Peninsula
Luxury Residential Condominium. All Telephone, Computer Networking and CATV wirings.
St. Francis Hospital, Liliha, Medical Office Plaza
600 Workstations, 1 MDF, 3 IDFs, in 6-story medical building. Optical Fiber backbone and telephone riser cables.
Kapolei Intermediate School
Data and voice facilities for 9 buildings in the campus. 334 data and 220 voice outlets. Single and Multi mode fiber optic cables networking all 9 buildings.
Sheraton, Moana Surfrider
Install cabling and air condition energy saving units.
Bishop Square
Upgrading of ADA compliant fire alarm systems.